To give oursleves a rough estimate of when we will be making certaing parts of our film trailer and also to help work out when will be best to make the magazine and poster we have made a production schedule.
Some of the areas that are to be done are being worked on at the same time this is usually due to somebody else within the group will be doing one thing whilst another person does another, this is due to the areas we have placed oursleves in e.g. I am going to be in control of mise en scene whilst others may be doing sound and editing. It is also due to certain criteria that needs to be completed are very similar in what is needed and therefore will work better when worked with alongside other criteria e.g. doing the storyboard at the same time as the script saves time, or doing my drafts for my poster the same time i make drafts for the magazine.
No comments:
Post a Comment